
On September 24, 2006, Mr. Li Yizhong, Minister of the State Administration of Work Safety, inspected the Integrated Petrochemical Site, accompanied by Dr. Blumenberg, President of the Company, and other senior staff. At the Company's Emergency Response Center (ERC), Mr. Shao Xuehua, Director of EHS/Utilities Department, introduced the work on emergency response and showed the emergency response vehicle and related equipments to Mr. Li Yizhong. Then, Mr. Li Yizhong inspected Central Control Room of the Company's Ethylene Plant and then Power Plant.
Mr. Wang Dexue and Mr. Sun Huashan, both Vice Minster of the State Administration of Work Safety, Mr. Peng Jianxun, Vice Minister of the State Administration of Coal Safety, and directors of the State Command Center of Emergency Response and other related offices, also joined the inspection.

- Founded in 2000 as a joint venture between BASF and Sinopec- Annual output of approximately 3 million metric tons, caters to the evolving market

- Founded in 2000 as a joint venture between BASF and Sinopec- Annual output of approximately 3 million metric tons, caters to the evolving market

On the afternoon of June 19, BYC held a Community Dialogue to deepen communication and cooperation with the neighboring communities and local governme

- Expansion to serve growing demand from various industries in the Chinese market- Newly built facilities to utilize renewable energy, aiming to signi